This paper mainly intorduces the manufacturing technology of the three low
temperature towers made of
315 % Ni steel 、including welding procedure , stress relief heat treatment after
welding (PWHT) , the form2
ing and the assembling process of head and shell as well as hydrostatic tests
procedure , which are the deter2
mining factors for the successful fabrication of the equipment .